top of page

Toronto Building Permit Drawings – West Point, Scarborough

Cadaxx Design prepared complete Toronto building permit drawings for the West Point renovation project in Scarborough. Our BCIN-licensed team handled design, coordination, and city submission, ensuring fast, code-compliant approval under the Ontario Building Code.

The project involved interior layout improvements, upgraded finishes, and a more functional kitchen and living area.

Cadaxx provided clear, accurate documentation ready for construction, helping the homeowners achieve a seamless renovation process from initial design to final permit approval.

This West Point project also included a legal basement apartment permit coordinated by Cadaxx Design.
Explore the full scope of this home upgrade:
👉 Legal Basement Apartment – West Point, Scarborough

Explore this project

More Interior Reno Projects

49999920207_a4969d3a55_k.jpg

Project Overview

This interior renovation modernized the main floor layout and improved basement usability. Cadaxx produced detailed permit drawings and handled the entire City submission process for a seamless approval.

Key Details

  • Location: West Point Ave, Scarborough (Toronto)

  • Type: Interior renovation with basement upgrades

  • Scope: Design · Permit Drawings · Coordination

  • Status: Approved / Completed

Results

  • Reconfigured living and kitchen spaces

  • Enhanced lighting and insulation performance

  • Updated HVAC layout and stair access

  • Permit approved without revisions

Design & Layout Enhancements

The renovation balanced functional design with code compliance, improving daily use and energy performance.

Highlights

  • Open-concept kitchen and dining area

  • Reinforced framing for partial wall removals

  • Energy-efficient upgrades to windows and finishes

  • Refined basement layout for multi-use living

  • Clear, accurate permit drawings for construction coordination

Cadaxx provides building permit drawings that are precise, code-compliant, and ready for City review.

Construction Highlights

Cadaxx supported the builder during construction, ensuring that all framing, openings, and finishes matched the approved permit drawings.
The result is a clean, modern space that’s fully compliant with Toronto’s standards.

In addition to preparing full Toronto building permit drawings, Cadaxx Design managed the exterior facelift for this West Point home in Scarborough.
The scope included façade refinishing, updated entry details, and new energy-efficient windows — all designed to enhance curb appeal while meeting City of Toronto permit requirements.

Highlights:

  • Updated exterior finishes and trim details

  • Improved insulation and window performance

  • New front entry configuration and porch detailing

  • Coordinated structural and permit drawings for City approval

Cadaxx handled both the design coordination and the permit submission, ensuring the project met all Ontario Building Code and zoning standards.

Related Project – Legal Basement Permit

Why Choose Cadaxx for Toronto Building Permit Drawings

  • Specialists in Toronto building permit drawings for homes and additions

  • BCIN-licensed team familiar with OBC Part 9 and City standards

  • Fast, accurate documentation for quick approval

  • Structural and mechanical coordination included

  • Trusted by homeowners and builders across the GTA

Ground Floor
2nd Floor
Exterior

Toronto Building Permit Drawing Process

Cadaxx follows a proven process to prepare building permit drawings in Toronto, ensuring complete compliance and smooth City approval.

Steps:

  1. Site measurement and existing condition verification

  2. Zoning and OBC review

  3. Layout redesign and client feedback

  4. Creation of detailed permit drawing set (plans, elevations, sections, details)

  5. Coordination with structural and HVAC consultants

  6. Submission to the City of Toronto and examiner correspondence

Our efficient documentation process helps reduce review time and speed up approvals.

FAQs — Toronto Building Permit Drawings

Q1: Who can prepare building permit drawings in Toronto?
BCIN-licensed designers like Cadaxx are qualified to prepare and submit complete permit drawing packages to the City of Toronto.

Q2: What’s included in a building permit drawing set?
Plans, elevations, sections, details, notes, and code references required by the City for review.

Q3: How long does approval take?
Most residential interior renovation permits are approved within 3–6 weeks once drawings are submitted.

Start Your Toronto Building Permit Drawings with Cadaxx

Cadaxx Design helps Toronto homeowners obtain building permit drawings for renovations, additions, and conversions — quickly and accurately.
👉Contact us today to start your Toronto permit application.

bottom of page