top of page

Interior Renovation Permit – Barrymore Rd, Toronto

Cadaxx Design provided full interior renovation permit services for a home on Barrymore Rd in Scarborough, Toronto — including design coordination, zoning confirmation, and complete permit drawings.
Our team ensured fast approval by preparing detailed plans compliant with the Ontario Building Code and City of Toronto submission standards.

Project Overview

This project included a full interior renovation of the main floor and basement. Cadaxx handled the entire permit application process, responding to examiner comments and coordinating with consultants to ensure compliance.

Key Details:

  • Location: Barrymore Rd, Scarborough (Toronto)

  • Type: Interior renovation

  • Scope: Design · Permit Drawings · OBC Coordination

  • Status: Completed 2025

Why You Need an Interior Renovation Permit in Toronto

Most interior renovations in Toronto that involve removing walls, adding rooms, or updating plumbing/electrical systems require a building permit.
Cadaxx helps homeowners prepare complete permit-ready drawings and manage the application from start to finish — saving time and avoiding costly re-submissions.

Design & Layout Improvements

The renovation modernized the home’s interior while keeping structural integrity intact.

Highlights:

  • Reconfigured open-plan kitchen and living area

  • Updated bathrooms and ventilation systems

  • Basement layout redesigned as separate apartment

  • Improved insulation and lighting efficiency

  • Drawings prepared to meet all Toronto Building Division standards

After
Before

The property was completely outdated and required a full remodel. The main floor features light flooring and dated floral wallpaper. The bathroom has an old sliding glass tub enclosure and a sickly yellowish-green color palette. The basement is partially finished with a mix of damaged drop ceiling tiles, exposed utilities (wiring, ductwork), pink-painted block walls, and old carpeting, suggesting moisture risk and lack of modern code compliance.

Permit & Code Compliance Process

Cadaxx handled the interior renovation permit submission under OBC Part 9, ensuring all details met structural and fire-separation requirements.

Our Steps:

  1. Site measurement and as-built drawing creation

  2. Development of new layout plan

  3. Preparation of permit drawings for submission

  4. Coordination with HVAC and structural consultants

  5. City of Toronto submission and follow-up

FAQs — Interior Renovation Permits in Toronto

Q1: When do I need a building permit for an interior renovation in Toronto?
You need one if you remove or relocate walls, add plumbing fixtures, modify stairs, or finish a basement.

Q2: How long does the interior renovation permit process take?
Typically 3–6 weeks, depending on project complexity and examiner workload.

Q3: Can Cadaxx manage the entire permit process for me?
Yes. We handle design, engineering and full permit submission — including examiner correspondence until approval.

Learn more about interior renovation permits in Toronto

See how Cadaxx manages all types of home addition permits

Start Your Interior Renovation Permit in Toronto

Cadaxx Design helps Toronto homeowners obtain interior renovation permits quickly and efficiently. Our team prepares detailed permit drawings, handles zoning and code coordination, and manages the full submission process with the City of Toronto. From basement updates to full home reconfigurations, Cadaxx delivers smooth approvals and modern, functional spaces.

Cadaxx Design helps Toronto homeowners get interior renovation permits approved quickly — with clear drawings, professional coordination, and full OBC compliance.
Contact us to start your renovation permit today.

bottom of page